NCI Academy

Intervention:

"Stick" facade project with ogival shading blades and maintenance walkways, suported by steel cantilevers. Some facades with stainless steel screen mesh.

Structural calculations, concept and development; shop drawings and  installation drawings.

Location:
Oeiras, Portugal
Year:
2018
Main Contractor:
Mota Engil
Façades Contractor:
Jofebar